Stainless Steel High Pressure Tee

Stainless Steel High Pressure Tee This high pressure tee features 316 stainless steel construction with higher nickel content and higher molybdenum content for better corrosion resistance.
MOQ:
1 PCS
Prices:
Negotiable
Temperature range:
- 29 ~ 300 ºC
Pressure:
3000 LB
Payment Terms:
L/C, D/A, D/P, T/T, Western Union
Material:
Stainless Steel 304 316
Certification:
ISO9001
Packaging Details:
Carton and wood case
Delivery Time:
Depends on the qty of order
Supply Ability:
20000pcs per month
Place of Origin:
WENZHOU,CHINA

Stainless Steel High Pressure Tee

This high pressure tee features 316 stainless steel construction with higher nickel content and higher molybdenum content for better corrosion resistance.

Specific Fitting Shape: Tee
Pipe Fitting Material: Stainless Steel, 316 Stainless Steel
Material Grade: 304/316
Class: 3000LB
itting Side A Gender: Female
Fitting Side A Type: NPT
Fitting Side A Pipe Threading: NPT
Fitting Side B Gender: Female
Fitting Side B Type: NPT
Fitting Side B Pipe Threading: NPT
Fitting Side C Gender: Female
Fitting Side C Type: NPT
Fitting Side C Pipe Threading: NPT
Max. Steam Pressure: - 29 ~ 300 ºC
Includes Pre-Applied Thread Sealant: No
Includes Seal: according to customer needs
Standards: ASME B16.11, ASTM A182

High pressure female thread Tee Reducer are used for pipe weld connections, it is widely used in industrial.The pipe fittings has a maximum working pressure of 3000 LB and is made of stainless steel. It is suitable for high pressure and corrosive media.

PRODUCTION PROCESS CHART
1. FORGING
ROUND: BARS→CUTTING→HEATING→FORGING→CHAMFERING→HEAT TREATMENT(ASREQUIRED)MECHANICAL&HARDNESS TESTING→SURFACE TREATMENT→ROUGH FORGINGS
2. MACHINNG-SOCKET WELD:
ROUGH FORGINGS→DRILLING→FACING→BORING→DIMENSIONAL CHECK→MARKING CLEANING→SURFACE TREATMENT(RUST-PROOFFOR CARBON&LOW ALLOY STEEL)→FINAL INSPECTION→FINISHED
3. MACHINNG-THREADED:
ROUGHFORGINGS→DRILIING FACING→BORING→THREADING→DIMENSIONAL CHECK→MARKING→CLEANING→SURFACE TREATMENT(RUST-PROOF FOR CARBON&LOW ALLOYSTEEL)→FINAL INSPECTION→FINISHED
4. DELIVERY:
CUSTOMER'S ORDER→PRODUCTION CONTROL→HEAT NO. IDENTIFICATION→MATERIAL CERTIFICATION DOCUMENT→PACKING→SHIPPING

Feedback